The curator’s take

Shaoliang Yang and Jun Wang (Santa Clara University) test 12 language models in 4,860 calls on engineering designs set at known margins above or below mechanical limits, and they find that calculation accuracy, feasibility judgment and full-answer rejection separate from each other.

Ask this paper

Key points
01

Setup. Beam loads and disk speeds are set at known percentages above or below plastic collapse or burst, and each model's limit calculation is measured separately.

02

Acceptance failure. Three models accepted beams 10 to 30% beyond collapse despite precise limit calculations, and many accepted replies stated the violation.

03

Feasibility questions. Asked only about feasibility, Opus 5 and Gemini 3.8 Flash rejected every impossible new design they were given, including ones accepted in full answers, with no false alarms.

04

Prompt effects. On the original beams, rewording the decline rule raised Opus 5 from 3 to 10 rejections of 20, and a status per answer raised it to 14. These gains did not hold consistently on new designs.

Abstract

When a language model returns engineering quantities with the status "solved", software that trusts it passes them on, even when the requested design is physically impossible. Such failures could reflect poor calculation, how the answer is requested, or a failure to judge feasibility. We set beam loads and disk speeds at known percentages above or below plastic collapse or burst, measured each model's limit calculation separately and tested 12 models in 4,860 calls, including follow-up experiments on new designs. We find that a model can recognize an impossible design when asked only whether it is feasible, yet accept the same design, reporting "solved", when asked for a full answer. Three models accepted beams 10 to 30% beyond collapse despite precise limit calculations in separate questions, and many accepted replies stated the violation. Asked only about feasibility, Opus 5 and Gemini 3.8 Flash rejected every impossible new design they were given, including those accepted in full answers, without false alarms. Rewording when to decline or changing the answer format raised rejection on the original beams, but not consistently on new designs. Software and benchmarks using a model's status should test feasibility judgment and full-answer rejection separately, and report the exact prompt.