Higher-Scoring Coding Models Did Not Get More Work Done

Yining Hua (Harvard University) uses a 19-day loss of access to Claude Fable 5 in June 2026 as a natural experiment to test whether a model that scores higher on coding benchmarks gets more real work merged on GitHub.
Ask this paper
Natural experiment. A June 12, 2026 export-control directive cut access to Fable 5 for 19 days. Most users switched to Opus 4.8, which scores 11 points lower on SWE-Bench Pro, while the people and projects stayed the same.
Design. The study tracks pull requests of 297 Fable 5 users before, during and after the suspension, against 8,908 developers who stayed on Opus 4.8, using difference-in-differences with developer and date fixed effects.
No significant gain. Fable 5 access raised the 7-day merge rate by 1.4 points [-1.4, +4.3], not significant. Pull requests merged per week rose 2.4% [-4.9%, +10.2%], also not significant.
Upgrades show the same. Across five model upgrades (1,208 developers, 15,442 pull requests), the weighted mean change in merge rate is -0.9 points [-1.9, +0.2]. All five estimates are negative and all intervals include zero.
Abstract
New coding models advertise themselves on score improvements of coding benchmarks. Yet no study has tested if a model that scores higher on these benchmarks gets more real work done. On June 12, 2026, a U.S. export control directive banned access to Claude Fable 5 for 19 days, which forced users to switch to other models. During this time, most former Fable 5 users switched to Opus 4.8 (11 points lower on SWE-Bench Pro compared to Fable 5). We treat this suspension as a natural experiment, where the people and projects stayed the same and only the model changed, so we could isolate the effect of Fable 5 on user productivity. We tracked GitHub pull requests of 297 Fable 5 users before, during, and after the suspension. We used 8,908 developers who stayed on Opus 4.8 all the time as the control group. We also repeated the comparison across five model upgrades before and after the suspension in 2026 (1,208 developers, 15,442 pull requests). Fitting a difference-in-differences model with developer and date fixed effects, we found that having access to Fable 5 increased the 7-day merge rate of pull requests by only 1.4 percentage points [-1.4; +4.3], which was not statistically significant. Similarly, no significant increases of merge rates were found with the upgrades (weighted mean: -0.9 percentage points [-1.9; +0.2]); all five estimates were negative (95% intervals included 0, did not differ from each other). We also did not observe a significant increase in the number of pull requests merged per week (+2.4% [-4.9%; +10.2%]).