← All papers  /  Nov 5, 2026
Agents · Code · Evaluation

Take It From Here: Evaluating Coding Agents On Project Takeover

First page
Take It From Here: Evaluating Coding Agents On Project Takeover
The curator’s take

Dingxian Wang, Zhe Fu, Jiaqi Deng and colleagues at Upwork and the University of Technology Sydney evaluate coding agents on project takeover: reading a long interaction history, recovering the requirements that still apply, and implementing a new request in the existing project.

Ask this paper

Key points
01

Task. Agents get the interaction history, the current request and the pre-request project environment, and delivery tests judge the result.

02

Headline. Across six model-harness configurations and 37 executable targets, the mean complete-delivery rate with full history is 4.95%.

03

Requirement diagnosis. Using requirement atoms, none of the six configurations produces a fully correct post-request requirement state. A case study shows agents dropping constraints they had recovered earlier while updating.

04

Oracle targets. Given the correct target state, complete delivery rises only to 8.11%. Build and regression pass rates are 96.40% and 90.99%, but target-test success is 9.01%.

05

Release. ReqMemBench combines requirement diagnostics with delivery validation to measure both halves of takeover.

Abstract

Coding agents increasingly collaborate on long-term projects. When taking over a project, they need to recover currently applicable requirements from the interaction history and update them in response to new requests. However, most coding benchmarks do not include long interaction histories, and some evaluations that consider history still do not cover the full process from requirement reconstruction to project delivery. We therefore provide agents with the interaction history, current request, and pre-request project environment, ask them to make the requested changes, and assess takeover performance through delivery tests. Across six model-harness configurations and 37 targets eligible for executable validation, the mean complete-delivery rate under Full History is only 4.95%. We then use requirement atoms to independently diagnose a larger set of takeover targets, examining relevant information identification, pre-request state reconstruction, and current request processing. We further supply correct pre-request or target states to examine the remaining difficulties in requirement processing and project modification. The diagnostics show that none of the six configurations produces fully correct post-request requirement states, and a case illustrates omission of previously recovered constraints during updating. With correct target states supplied, the mean complete-delivery rate is 8.11%, with build and regression pass rates of 96.40% and 90.99%, but target-test success remains 9.01%. These results show difficulties in both forming target requirement states and implementing supplied targets in existing projects. Based on these findings, we introduce ReqMemBench, which combines requirement diagnostics with delivery validation to support systematic evaluation of project takeover.

Every Monday
Get next week’s papers.
Subscribe on Substack